1 - The fleet arrive. 9.30am.
2 - The site at which the job was about to take place.
3 - 2 of the lads get harnessed onto the cliff side getting ready to pass all of the kit to the site lower down. 10am.
4 - Here we go. The first of many...
5 - Once the kit was down, it was laid out and built up. 11.15am.
6 - Then it is lifted into position. 11.45am.
7 - Not just 1 marquee, but 5 in total.
8 - From some angles it looked a maze of metal work.
9 - It is then time to prepare the PVC.
10 - ...and put it in its place. 2pm.
11 - The main man. The smile says it all.
12 - The marquees are taking shape.
13 - The view from the cliff side.
14 - As the sun goes down on the first day all the structures have a few final touches made to them. 7pm.
15 - DAY 2: The day was beautiful, but the waves were crashing a little close at times! 9am.
16 - The furniture and coloured drapes are set in place.
17 - The views of the open sea behind makes for a stunning location.
18 - The house only adds to already fantastic scenery.
19 - The final picture at the top. 11am.